Service
Decks & Outdoor Structures
Decks in the Pacific Northwest fail from the frame out, not the boards down. Water sits in the joist bays for eight months a year, and once the ledger or the post bases go, the surface no longer matters. We build the structure for that reality and finish it to match the house.

What’s included
- New deck design and construction
- Structural rebuilds of failing frames
- Cedar, pressure-treated, and composite decking
- Railing systems — wood, cable, and metal
- Stairs, benches, pergolas, and covers
- Cleaning, sanding, staining, and sealing
Every job carries our ten-year workmanship warranty, a fixed written price, and one lead carpenter from demolition to walkthrough.
The ledger and the flashing decide the lifespan
The single most common deck failure is a ledger board bolted to the house without proper flashing, quietly rotting the rim joist behind it. We flash ledgers correctly, use the right structural fasteners, and detail post bases so they drain instead of wicking. It is invisible work that determines whether the deck lasts twelve years or thirty.
Repair when repair makes sense
Not every tired deck needs replacing. If the frame is sound, re-decking and re-railing costs a fraction of a rebuild. We will tell you which one you are looking at, and we will say so even when the answer is the smaller job.
Finishes that survive the winter
We stain and seal on the right side of the weather window, and prefinish the underside and cut ends of boards where moisture actually gets in. Most deck coatings fail early because they were applied to damp wood in the wrong month.
We asked for a full rebuild and they talked us out of it. The frame was sound; we only needed new decking and rail. It cost about a third of what we had budgeted. Any contractor who tells you that you need less than you asked for has earned the next job, and they've got it.
Jim & Ellen K.Sellwood, Portland
Questions
Common questions
- Cedar or composite?
- Cedar is warmer looking and cheaper up front but wants cleaning and re-coating every two or three years here. Composite costs more initially and asks almost nothing of you afterward. If you dislike maintenance, composite pays for itself in this climate.
- Do decks need a permit?
- In most local jurisdictions, yes — typically once the deck is more than 30 inches above grade or attached to the house. We handle the application and inspections.
- When is the best time to build?
- We frame year-round. Staining and sealing want dry weather, so late spring through early fall is ideal for finish work. We will often build in winter and return to coat it when conditions are right.
Get started
Ask about decks & outdoor structures
Tell us roughly what you have in mind. We reply within one business day, and the site visit is free.
Prefer to talk? (971) 977-3858, monday – friday, 7:00 AM – 5:00 PM.
Related
You might also need
- Fences & GatesCedar privacy fences, custom gates, and repairs — set on posts that stay upright.
- Pavers & PatiosPaver patios, walkways, and driveways built on a base that will not settle.
- Interior & Exterior PaintingPreparation-first painting for interiors and exteriors, plus cabinet and trim finishing.
Tell us what you're planning
We'll walk the site, look at what's actually there, and give you a fixed written price. No pressure, and no charge for the visit.
Oregon CCB #000000 · Washington L&I NWCRAFT000AA · Bonded & insured

