A bathroom is the smallest room in the house and the most expensive one to get wrong. Almost every bathroom failure we get called to repair traces back to waterproofing that was rushed. We build the wet areas to the tile industry's assembly standards and photograph every layer before it gets covered.

Bathroom Remodeling work by our crew

What’s included

  • Full demolition and disposal
  • Shower pans, curbs, and bench framing
  • Waterproofing membrane over the entire wet area
  • Tile setting — floors, walls, niches, and curbless entries
  • Vanity, fixture, and glass installation
  • Exhaust ventilation sized to the room

Every job carries our ten-year workmanship warranty, a fixed written price, and one lead carpenter from demolition to walkthrough.

Waterproofing is the part you will never see

Cement board is not waterproof. We install a bonded membrane across the full wet area, flood-test shower pans before tile, and treat every corner, niche, and penetration as its own detail. You get the photos of each stage, which also makes any future warranty conversation simple.

Ventilation gets sized, not guessed

A large share of the mold we find behind Portland bathroom walls comes from a fan that was too small or vented into the attic instead of outside. We size the fan to the room's volume and duct it to a proper exterior cap. In a wet climate this matters more than any finish choice.

Curbless and aging-in-place work

If you want a curbless shower, blocking for future grab bars, or a comfort-height vanity, say so during planning. Structural allowances for a zero-threshold entry are cheap while the floor is open and expensive afterward.

  • Our only bathroom, so I was dreading it. They sequenced the work so we kept a usable toilet for all but four days and told us exactly which days those would be, a week ahead. The photos of every waterproofing layer before it got covered were a nice touch — I know what's behind that tile.
    Priya S.Irvington, Portland

Questions

Common questions

How long will I be without the bathroom?
A standard hall bath runs three to five weeks on site. Tile and glass drive the schedule — grout and sealants need cure time that cannot be compressed, and shower glass is measured after tile is set, which adds a one to two week fabrication window.
Can you work around a single-bathroom house?
Yes. We sequence to keep the toilet usable as long as possible and can set up a temporary alternative. Tell us during the walkthrough so we can plan for it rather than improvise.
What does a bathroom remodel cost?
It depends far more on scope than on square footage. Moving plumbing, going curbless, or opening a wall changes the number substantially. We give a fixed written price after the walkthrough rather than a range that moves later.

Get started

Ask about bathroom remodeling

Tell us roughly what you have in mind. We reply within one business day, and the site visit is free.

Prefer to talk? (971) 977-3858, monday – friday, 7:00 AM – 5:00 PM.

A sentence or two is plenty. We'll ask the rest on the call.

No obligation. We never share your details.

Tell us what you're planning

We'll walk the site, look at what's actually there, and give you a fixed written price. No pressure, and no charge for the visit.