A kitchen remodel touches every trade in the house at once: framing, plumbing, electrical, cabinetry, tile, and finish carpentry all have to land in the right order. We run the whole sequence with one lead carpenter on site, so nobody is waiting on a subcontractor who never got the call.

Kitchen Remodeling work by our crew

What’s included

  • Design and layout planning, including wall removals
  • Cabinetry — custom, semi-custom, or supplied by you
  • Countertop templating and installation
  • Backsplash and floor tile
  • Plumbing and electrical rough-in with licensed trades
  • Permits and inspections handled start to finish

Every job carries our ten-year workmanship warranty, a fixed written price, and one lead carpenter from demolition to walkthrough.

We plan the whole job before demolition starts

Most kitchen remodels go sideways for the same reason: the schedule was built on optimism. Before we open a wall we confirm cabinet lead times, appliance dimensions, and the electrical panel's spare capacity. Anything with a six-week lead time gets ordered first. It is a slower start and a much shorter middle.

Older Portland homes need older-house experience

Much of our work is in houses built between 1905 and 1940. Knob-and-tube wiring, cast-iron waste lines, floors that are out of level by an inch across the room — these are normal here, not surprises. We scope for them up front and price them into the estimate rather than discovering them on day three.

You keep a working kitchen for as long as possible

We stage demolition so the sink and a working circuit stay live into the last practical week, set up dust containment at the doorways, and clean the site daily. It is still a construction zone, but it stays a livable one.

  • They gave us a schedule at the start and then actually held to it, which after two previous remodels I had stopped believing was possible. When they opened the wall and found the old knob-and-tube, we got photos the same afternoon and a price before anyone touched it. No drama, no invoice we hadn't agreed to.
    Dana R.Alameda, Portland

Questions

Common questions

How long does a kitchen remodel take?
A cosmetic refresh — counters, backsplash, paint, hardware — runs two to three weeks. A full gut with new layout, cabinets, and moved plumbing typically runs six to ten weeks on site, after a four to eight week planning and ordering period.
Do I need a permit?
If you move plumbing, alter electrical circuits, or change structure, yes. Swapping cabinets and counters in place generally does not require one. We pull and manage whatever the scope needs, and the permit cost appears as a line item in your estimate.
Can I supply my own cabinets or appliances?
Yes, and plenty of clients do. We will review the specs before you order to make sure everything fits the plan, and we install them the same way we would our own supply.

Get started

Ask about kitchen remodeling

Tell us roughly what you have in mind. We reply within one business day, and the site visit is free.

Prefer to talk? (971) 977-3858, monday – friday, 7:00 AM – 5:00 PM.

A sentence or two is plenty. We'll ask the rest on the call.

No obligation. We never share your details.

Tell us what you're planning

We'll walk the site, look at what's actually there, and give you a fixed written price. No pressure, and no charge for the visit.